The NJDOT Route 295 Direct Connect Project is a three-year, multi-stage highway construction project with several types of foundation elements. The foundations work consists of ground improvements, varied types of earth retention systems, driven piles and drilled shafts. PKF has self-performed the majority of these foundation elements including 11,000 square feet of permanent steel sheet pile earth support, 69,000 square feet of temporary steel sheet pile earth support, 30,000 square feet of temporary soldier beam and lagging earth support, and 3,000 square feet of temporary wire wall earth support. PKF has also installed 300 hollow-core drilled and grouted tie-backs for the above referenced earth support systems, and has driven approximately 27,000 linear feet of H-piles.
#249 | NJDOT Route 295 Direct Connect
Bellmawr, NJ
Owner: |
NJDOT |
Engineer: |
Dewberry Engineers |
Cost: |
$162,131,000.00 |