Purpose

To provide Engineering, Construction, Management and Operating Solutions on Projects where Safety, Quality and Excellence are Required, Recognized and Rewarded.

Building Blocks

Passing of Richard L. Foster

 

PKF's President, Glenn Ely, remembers one of PKF's founders.

Board of Directors Announcement

 

PKF is pleased to announce the addition of Mitch Baland to the Board of Directors.

Happy 50th Birthday, PKF!

 

The UTCA featured PKF on their August 2019 cover to highlight 50 years in the construction industry.

Marine

#275 | NJDOT Fender Replacement

NJDOT contracted PKF-Mark III, Inc. to replace four fender systems in Cape May County as part of a Maintenance Division project.
More Info

Transit

#274 | NJT Portal Bridge GC-01

NJ Transit issued GC-01, Construction of Temporary Fiber Optic Poles, Construction Access Finger Pier, and 138KV Monopoles, Utility Protection Structure, Retaining Wall E to complete preparatory work for the main Portal Bridge replacement contract.
More Info

Marine

#265 | RACCOON CREEK BRIDGE REPLACEMENT

Replacement of the 80-year-old Raccoon Creek lift bridge with a higher bridge that would not require opening for taller vessels.
More Info

Transit

#264 | SECANE STATION & UNDERPASS

Highlights: Modernization of an outdated facility; safety upgrades & handicap accessibility 1,200 LF of elevated concrete platforms; 60 caissons, each 36 inches in diameter
More Info

Transit

#259 | EXTON STATION IMPROVEMENTS

Highlights: Safety upgrades & handicap accessibility; 1,400 LF of elevated concrete platforms; 150 LF post-and-plank retaining wall; steel posts encased in 42-inch caissons
More Info

Highway & Bridge

#254 | I-95 to PA Turnpike Connection

The PA Turnpike/Route 95 Direct Connect is the first of four Owner contracts that, once completed, will connect the PA Turnpike to I-95. The Direct Connect interchange will be the last section of Route 95 enabling vehicles to travel between Maine and Florida without exiting the highway.
More Info

Foundation

#249 | NJDOT Route 295 Direct Connect

The NJDOT Route 295 Direct Connect Project is a three-year, multi-stage highway construction project with several types of foundation elements.
More Info

Water & Waste Water

#246 | CROSS KEYS PUMP STATION

Highlights: Construction of new pumping station; Installed all mechanical and electrical components
More Info

Water & Waste Water

#242 | ROSELLE WATER BOOSTER STATION

Highlights: Demolition and reconstruction of pumping station; installation of all electrical components; installation of all mechanical systems
More Info

Electrical & Mechanical

#240 | Trenton Central Pump Station

Highlights: Demolition & construction of a 26KV station; 2 new standby generators; Installation of 4, 250-750 HP pumps; Installation of 4, 5KV motor starters.
More Info

Highway & Bridge

#238 & #239 | NJ Turnpike Intchg 7A & 8

The NJTA contracted PKF to build 26 independent new bridges at turnpike interchanges 7A and 8.
More Info

Foundation

#237, #241, #244, #245 | NJTA VMS & VSLS

The New Jersey Turnpike Authority is proceeding with the installation of state-of-the-art technology, Variable Message Signs (VMS) and Variable Speed Limit Signs (VSLS) at new and existing locations along the Parkway and Turnpike.
More Info

Water & Waste Water

#235 | CCMUA Sludge Drying Facility

Highlights: Retrofitted existing facility; Installed new sludge drying equipment; Installed all new ancillary equipment.
More Info