#240 | Trenton Central Pump Station

Trenton, NJ


City of Trenton, Water Works Dvision


Hatch Mott MacDonald



The work consisted of the demolition and removal of an existing 26KV electrical substation, construction of a new 26 KV electrical substation built to PSE&G requirements; including two new standby generators; removal of the existing natural gas engine and installation of new electric motors on four existing pumps (horsepower ranging from 250 HP to 700HP); installation of two 5KV VFD’s and two 5KV RVAT motor starters ; asbestos abatement; instrumentation and electrical improvements; and HVAC, plumbing, architectural and security improvements.