Marine
#275 | NJDOT Fender Replacement
NJDOT contracted PKF-Mark III, Inc. to replace four fender systems in Cape May County as part of a Maintenance Division project.
More Info
Transit
#274 | NJT Portal Bridge GC-01
NJ Transit issued GC-01, Construction of Temporary Fiber Optic Poles, Construction Access Finger Pier, and 138KV Monopoles, Utility Protection Structure, Retaining Wall E to complete preparatory work for the main Portal Bridge replacement contract.
More Info
Marine
#265 | RACCOON CREEK BRIDGE REPLACEMENT
Replacement of the 80-year-old Raccoon Creek lift bridge with a higher bridge that would not require opening for taller vessels.
More Info
Transit
#264 | SECANE STATION & UNDERPASS
Highlights: Modernization of an outdated facility; safety upgrades & handicap accessibility
1,200 LF of elevated concrete platforms; 60 caissons, each 36 inches in diameter
More Info
Transit
#259 | EXTON STATION IMPROVEMENTS
Highlights: Safety upgrades & handicap accessibility; 1,400 LF of elevated concrete platforms; 150 LF post-and-plank retaining wall; steel posts encased in 42-inch caissons
More Info
Highway & Bridge
#254 | I-95 to PA Turnpike Connection
The PA Turnpike/Route 95 Direct Connect is the first of four Owner contracts that, once completed, will connect the PA Turnpike to I-95. The Direct Connect interchange will be the last section of Route 95 enabling vehicles to travel between Maine and Florida without exiting the highway.
More Info
Foundation
#249 | NJDOT Route 295 Direct Connect
The NJDOT Route 295 Direct Connect Project is a three-year, multi-stage highway construction project with several types of foundation elements.
More Info
Water & Waste Water
#246 | CROSS KEYS PUMP STATION
Highlights: Construction of new pumping station;
Installed all mechanical and electrical components
More Info
Water & Waste Water
#242 | ROSELLE WATER BOOSTER STATION
Highlights: Demolition and reconstruction of pumping station; installation of all electrical components; installation of all mechanical systems
More Info
Electrical & Mechanical
#240 | Trenton Central Pump Station
Highlights: Demolition & construction of a 26KV station; 2 new standby generators; Installation of 4, 250-750 HP pumps; Installation of 4, 5KV motor starters.
More Info
Highway & Bridge
#238 & #239 | NJ Turnpike Intchg 7A & 8
The NJTA contracted PKF to build 26 independent new bridges at turnpike interchanges 7A and 8.
More Info
Foundation
#237, #241, #244, #245 | NJTA VMS & VSLS
The New Jersey Turnpike Authority is proceeding with the installation of state-of-the-art technology, Variable Message Signs (VMS) and Variable Speed Limit Signs (VSLS) at new and existing locations along the Parkway and Turnpike.
More Info
Water & Waste Water
#235 | CCMUA Sludge Drying Facility
Highlights: Retrofitted existing facility; Installed new sludge drying equipment; Installed all new ancillary equipment.
More Info