NJ American Water Co. awarded PKF-Mark III, Inc. a contract to construct a 30-million gallon per day water treatment plant and intake structure/pumping station, with design at less than 50% complete. The completed plant treats Delaware River water with the most advanced treatment process available, including ozone disinfection, chemical coagulation, superpulsator clarification and deep bed granular-activated carbon filters.

The project included river intake, one 15-million-gallon raw water reservoir, twin 54-inch raw water mains, and a plant designed to be expanded to 100 million-gallon per day treatment capability.

PKF-Mark III, Inc., the Owner, and the Engineer worked in a true partnering spirit to optimize the project through final design, construction and start-up.